- Farm & Garden
- Pumps & Motors
- Food Processing
- Workshop, DIY & MRO
Fill Tanks:
Mix the chemical solution with diesel and fill the 2L tank.
Start Machine:
Connect a butane gas cylinder, open the gas valve, ignite, and preheat for 20 seconds.
Operate:
Pump the lever 2-3 times to discharge fog and repeat as needed.
Stop Machine:
Close the gas valve and pump 5-6 times to clear remaining chemicals.
Maintenance:
Clean the coil by pumping water through it to prevent clogging