Heavy Duty 4 stroke, 196 cc Earth Auger | Post Hole Digger | Soil Drilling Machine with 12 inch Auger Bit
SKU: BM-SM-20230169
Price : ₹28500 (Including GST)
Get extra ₹428 Discount (On Checkout)
Delivery By: Dec 27 - Dec 29
Qty:
BUY IN BULK
Easy Return & Refund
Quality Assurance
Trusted Delivery
After Sales Assistance
Buyer Protection
Short Description
Heavy Duty Petrol Operated Earth Auger
With 12 inch (30.48 cm) Auger Bit
196 cc, 4 Stroke Engine
Country of origin: China
Description
4 Stroke 196cc Heavy Duty Petrol Operated Earth Auger is suitable for drilling type of operation on grounds, farms, nurseries and green houses. Use for agriculture purpose for drilling in farms for banana plantations, vegetable crops. It is also used for agriculture institutes, horticulture plantations, highway authorities, and contractors for fencing. This Earth Auger is used in agriculture for digging holes in the soil. It makes holes for plantation or for erecting poles. It is much easier to dig soil.
Features
:
Sturdy Design
Easy to Operate & Maintain
Fuel Efficient
Excellent Digging Capability
Specification
:
Product Type: Two Man Operated
Brand: MECSTROKE
Engine Type : Single Cylinder, 4-stroke
Cooling Type : Air-cooled
Fuel Type : Petrol
Engine Oil : 4 Stroke Engine Oil (Oil No. 10W30)
Displacement : 196-cc
Power : 6.5 HP
Carburetor : Diaphragm
Ignition System : C.D.I
Max. Torque (N.m) : 10.5
Bit Length : 80 cm/ 2.6 foot (Approx..)
Bit Diameter : 12 inch/ 30.48 cm/ 1 foot (Approx.)
Dimension : 75 x 50 x 110 Centimeters
Weight : 36 kg (Approx.)
Applications
:
Used to dig soil in different kinds of soil
Usage
:
Before you start:
> Fill the tank with unleaded petrol. No 2T oil needed, there is a separate chamber for pouring the engine oil (20W40).
> Wear the necessary safety items like boots, gloves, etc for protection.
> Attach the appropriate auger bit for the desired hole size.
Starting the machine:
Operator 1:
- Check fuel level and ensure the fuel line is properly connected.
- Set the choke to the "choke" position.
- Prime the engine by pumping the primer bulb if necessary.
- While firmly holding the pull cord, pull it briskly to start the engine.
- Once the engine starts, slowly transition the choke to the "run" position.
Operator 2:
- Gradually increase the engine throttle to engage the auger into the ground.
- Maintain a firm grip on the handles and use body weight to push the auger down.
> Both operators should work together to maintain a steady pace and control the direction of the hole.
> Use the depth markings on the auger to reach the desired hole depth.
> Now, gently guide the auger bit into the ground, applying slight downward pressure to initiate drilling.
Shipping Weight & Dimensions
:Verified
This product will be shipped in 2 packages.View All