Heavy Duty-52 cc 2-stroke Earth Auger Engine with 254 mm (10 inch) Drill Bit | Soil Drilling Machine
4.0 star
SKU: AD-EA-20220717
MRP : ₹11988
Offer Price : ₹9990 (Including GST)
Get extra ₹150 Discount (On Checkout)
Delivery By: Dec 27 - Dec 29
Qty:
BUY IN BULK
Easy Return & Refund
Quality Assurance
Trusted Delivery
After Sales Assistance
Buyer Protection
Short Description
52-cc Petrol Earth Auger
10 inch (25.4 cm) Auger Bit
Displacement : 52cc
Country of origin: China
Description
Earth Auger is used in agriculture for digging holes in the soil. It makes holes for plantations or for erecting poles. It is much easier to dig soil with this machine and the process takes less time. Its machine comes in petrol with different sizes of bits. Hand Earth Auger can dig a hole up to 80 cm deep, depending on the diameter of the bit.
Features
:
Heavy Duty Build Quality
Easy to Use & Maintain
Excellent Digging Capability
Specification
:
Product Type: One Man Operated
Brand: Generic (Imported)
Engine Type : Single Cylinder, 2-stroke,
Cooling Type : Air-cooled,
Fuel Used : Petrol
Engine Displacement : 52-cc
Engine Power : 1.9 Kw (2.6 HP)
No Load Speed : 9000 RPM
Bit Length : 80 cm (Approx.)
Bit Diameter : 10 inch (25.4 cm) (Approx.)
Oil mixing : 30ml (2T) oil/1L of Petrol
Fuel Tank Capacity : 1 liter
Ignition : C.D.I
Fuel Consumption : 580 ml/hr (Approx.)
Digging Capacity : 70-80 Holes per 1 liter Petrol (Approx.)
Weight : 14 Kg (Approx.)
Accessories
:
10-inch (25.4 cm ) Auger Bit
Toolkit
Guide Manual
Oil Mixing Can
Applications
:
Used for Digging Holes in Different Kinds of Soil
Usage
:
Before you start:
> In a clean fuel container, mix 2T oil with petrol in the desired ratio (40 ML Oil in 1 Liter Petrol)
> Shake the container well to mix the fuel.
> Wear the necessary safety items like boots, gloves, etc for protection.
> Attach the appropriate auger bit for the desired hole size.
Starting the machine:
> Engage the choke lever on the carburetor to enrich the fuel mixture for easier starting.
> Pump the primer bulb several times to fill the fuel line with fuel.
> Mark the location where you want to drill the hole.
> Hold the throttle lever slightly open.
> Pull the starter cord firmly and consistently until the engine starts.
> Now, gently guide the auger bit into the ground, applying slight downward pressure to initiate drilling.
Shipping Weight & Dimensions
:Verified
This product will be shipped in 2 packages.View All